1. Strengthen mining management and conduct regular analysis of the position of the upper and lower mining sites. Once surface mining is found, it must be reported to the mine safety committee immediately, and relevant experts should be hired for analysis and research.
2, do well waterproof work at the wellhead, especially during the rainy season, to prevent flooding at the wellhead.
3. Prevent the ground from seeping water, and divert or remove the water bodies such as rivers and ditches within the minefield as much as possible before mining.
4. If it is not possible to divert or move out of the mining area, it is necessary to build a river dam and reinforce the river bed to prevent the mine from leaking or flooding during the flood season.
5. Strengthen the inspection of ground water prevention projects. Before the arrival of the rainy season, a comprehensive and systematic inspection of the entire groundwater prevention and control project should be carried out, and problems should be dealt with in a timely manner.
Lining Machine,Aerosol Cone Making Line,Spray Tin Can Cone Making Line,Aerosol Tin Can Cone Making Line
Zhoushan Putuo BODA Machinery Co., Ltd. , https://www.boda-machinery.com