What are the conditions for installing the checkweigher?

I do not know if you still remember what the contents of the last Xiaobian shared, there may be a lot of friends do not remember it, but this is normal, Xiaobian last time to share with you about the selection of automatic checkweigher eight Benefits, if unclear friends can click on the link to view. Today, Xiao Bian wants to talk to everyone about what conditions are needed to install the checkweigher. I think this issue is also a problem that many of my friends are concerned about. Then let's introduce it.

Installation of the checkweigher requires the following conditions: 1. The supply voltage does not fluctuate by more than ±10%;

2, to avoid air-conditioning wind blow directly to the equipment;

3. Non-volatile flammables, corrosive gas, and brine sites;

4. Sites where vibration is unlikely to occur;

5. Places with no high temperature heaters nearby;

6, places with less dust;

The above information is provided by Shanghai Chucheng Electronic Technology Co., Ltd. as a whole. For more information, please visit our website or contact us.