Haikou will invest 3.2 billion yuan to rectify drainage and drainage systems to build drainage pumping stations

On the 27th, the representative from the Fourth Session of the 14th National People's Congress of Haikou City made recommendations on the recommendations, criticisms, and opinions to be handled. He said that during the “Twelfth Five-Year Plan” period, Haikou will invest 3.23 billion yuan to solve the problem of urban drainage and drainage.

According to reports, during the “Twelfth Five-Year Plan” period, Haikou will build a rainwater pipe network laying project and a drainage pumping station project in an all-round way, achieving a 95% coverage of rainwater pipe networks in the main urban area. There are 15 drainage pumping stations planned and constructed, with a drainage flow of 145.5 cubic meters per second, and the flood discharge capacity of the township flood drainage will be once in 10 to 20 years.

According to reports, during the “12th Five-Year Plan” period, the six major flood prevention and mitigation projects in Haikou were as follows: Dangerous Reservoir Reinforcement Project, with an investment of 96.40 million yuan, to complete the task of removing the danger and reinforcement of 83 small reservoirs, and to restore the original design standards. The corresponding irrigation areas have reached Designing irrigation scale; Seven flood control projects including Simapo Island in key flood control (flood) embankment projects, investing 2.17 billion yuan, basically completing the construction of major river embankments and seawall projects; river rehabilitation projects will be remedied according to the 20-year flood control standard. 9 rivers, investment 540 million yuan; flood control building project, planning and construction of 83 comprehensive flood control buildings, can transfer 46,319 people affected by disasters; safety protection projects, plans to invest 35.15 million yuan, for the key protection and multiple accidents in the waterfront area, construction Multi-type protection projects (hard protective walls, low shrub walls, etc.); Non-engineering measures, plans to invest 10.2 million yuan to complete waterworks construction management information system (city sewage pump station, drainage pump station, pumping station remote Monitoring) and construction of water management function business subsystems (hydrology and water resources monitoring systems and flood prevention command systems).

Helmet

Children Cartoon Helmet, Kids Cartoon Helmet, Kids Protective Helmet, Sport Helmet, Bicycle Helmet, Ski Helmet, Skateboard HelmetChildren Cartoon Helmet, Kids Cartoon Helmet, Kids Protective Helmet, Sport Helmet, Bicycle Helmet, Ski Helmet, Skateboard Helmet

Children Cartoon Helmet, Kids Cartoon Helmet, Kids Protective Helmet, Sport Helmet, Bicycle Helmet, Ski Helmet, Skateboard Helmet

Huizhou City Melors Plastic Products Co., Limited , https://www.evaexpert.com