LED display using seven common sense you made a few mistakes?

With the continuous development of the economy and society, the application range of LED displays has become more and more extensive. Whether you are walking in the streets or in the bustling city square and high-end entertainment venues, you can see the LED display.
In today's widely used LED display, LED display using the seven common sense, you make it? The following Xiaobian and everyone to talk about how to use the correct LED display it.
First, the LED display line, switch check, keep the switch dry, to avoid leakage, electric shock accidents.
Second, the use of air conditioning can be used to dehumidify the LED display, place desiccant and physical means of moisture absorption, keep dry and prevent the display screen from moisture.
3. During the rainy season, the LED screen display is guaranteed to be used at least once a week for at least 2 hours each time.
Fourth, the LED display is moderately ventilated, allowing the water vapor attached to the display to quickly evaporate, reducing the humidity in the indoor environment. However, it should be noted that ventilation should be avoided in some windless and humid air, which will increase the humidity in the room.
Fifth, the use of outdoor LED display environment is complex, it is inevitable that there will be box seepage phenomenon. In addition to the above measures, it is usually necessary to regularly inspect whether the waterproof rubber ring of the box is aged, deformed, or incomplete; whether the screw or the lock of the sealed box is easy to loosen and the pressure is not enough.
Sixth, rental indoor LED display is used outdoors. When it rains, it must be cut off immediately. If you do not hurry to dismantle the screen, use a rain cloth that has been prepared in advance to quickly cover it. When the weather is clear, take the box out to dry. If you encounter continuous rain, you must open the back cover of the box and use a fan to open the cold wind. Then put it in a ventilated and dry room for more than 8 hours. Turn down the brightness of the display and ensure that the screen is lighted for more than 4 hours, and the moisture in the electronic components is fully emitted.
7. If the LED display is not used for a long period of time, it should be regularly powered on for maintenance and debugging. Whether it is indoor LED display or outdoor LED display, it will not be used for a long time. When it is re-enabled, it is likely that there will be dead lights and defects. Therefore, it is very necessary to electrify and lighten the screen.
Master the above seven major use of common sense, so that LED display to play its maximum efficiency, for enterprises to create a broader space for development!

Hospital and medical consumables refers to waste bins, disposable medical syringe, medical disposable bucket and baskets, the molding material is medical grade PP, volume can be different from 1ml, 2ml, 3ml, 5ml, 10ml, 20ml, 50ml, 60ml to 100ml, and needle is 16G-27G, Needle material: stainless steel 304 and life is 5 years. Please review the following specifications in details:


Standard needle size:


Needle size


Usage:
Tear the single bag of syringe, remove the syringe with needle, remove the syringe needle protection sleeve, pull the plunger back and forth slide, tighten the injection needle, and then into the liquid, needle up, slowly push the plunger to exclude air, subcutaneous or Intramuscular injection or blood.


Storage condition:
Disposable Medical Plastic 2 ml Syringe Luer Slip store in the relative humidity not to surpass 80%, non-corrosiveness gas, cool, ventilates good, in dryly the clean room. Product sterilized by Epoxy hexylene, asepsis,non-pyrogen without unusual toxicity and hemolysis response.


Machining equipment:


Disposable Medical Plastic Syringe mould CNC


Disposable Medical Plastic Syringe mould CNC


Disposable syringe mould EDM


FAQ:


Q1: How do you control quality of Disposable syringe mould quality?

A: We use our CMM measuring equipment to inspect mould critical dimensions and mould tryout sample parts, all dimension reports will be shared with customer and discussed with customer the best solutions to solve "NG" dimensions.



Q2: What are the MOQ and leading time?

A: 200000pcs each type; leading time is within 35 days or based on your quantity;


Q3: What are the terms of payment?

A: 50% in advance by T/T; the balance 50% by T/T before shipping or again copy of B/L, L/C  are acceptable.


Q4: How to keep us away from risk?

A: Our manufacturing is with rules of CE, ISO, welcome to visit our factory, and we can send you samples before placing an order.


Medical Consumables Plastic Mould

Medical Consumables Plastic Mould,Metal Injection Molding,Medical Syringe Plastic Injection Mould,Disposable Syringe Plastic Injection Mould

Zhejiang Ceeto Molding Technology Co.,Ltd. , https://www.ceetomold.com