Haitai Ship's 300-ton large towed line delivery

On November 13, the second 300-ton large towed line machine manufactured by Jiangsu Haitai Ship Complete Equipment Co., Ltd. was delivered to the user as scheduled.
It is reported that the towed machine has a drum load of 300 tons × 6 m / min, a dynamic brake of 60 ~ 300 tons Ã

Analysis of Automobile Manufacturing Capacity

The first automobile factory construction and its casting technology level. The first automobile factory started construction in 1953, and the first furnace hot metal was cast on March 26, 1956, declaring that China’s first large-scale production workshop for automobile castings wa